Lead paragraph
Improve and rebuild bridges to handle updated flood flows consistent with best available data.
Design work on a new bridge crossing Hover street is currently underway. The design is at a 30% stage and the proposed structure is intended to pass large flood events from the west which bypass the Hover/St Vrain bridge.